Answer
How do you plan capacity with simulation?
Model the plant as it runs today — stations, cycle times, shifts, breakdowns, changeovers — run it over a planning horizon and keep that run as the baseline. Then change one thing, such as a shift, a changeover time or a machine, and run it again: the difference in output, utilisation and lead time is the capacity the change would buy.
Simulation adds what an average in a spreadsheet hides: the breakdowns, changeovers and variability that make a line deliver less than its rated rate.
Reviewed 5 October 2026
How Optonum does it
- A fixed-time-step flow simulation that runs in the browser, with nothing to install.
- Breakdowns drawn from MTBF (Weibull) and repairs from MTTR, a shared maintenance crew, operator fatigue, sequence-dependent changeovers, scrap and rework, and demand variability.
- The run follows the plant's own shift calendar, and its warm-up period is found automatically.
- Each project keeps a baseline run, and a scenario is compared with it side by side.
- When the Bottleneck Oracle tests a remedy, it repeats the run to give a spread rather than one lucky answer.
What it does not do
- It is a flow model: queues exist only where a buffer is drawn, and lead time and work in process are calculated by formula.
- A run you start yourself is one run; its spread is the variation within that run, not a confidence interval.
- A simulated figure is an estimate from the data you entered, not a measurement of your plant.